Airport Projects


Our team has a vast amount of experience performing surveying services at local airports in the Tampa Bay area; Tampa International Airport (TPA), Plant City Airport, Tampa Executive (Vandenberg) Airport, St. Petersburg-Clearwater International Airport, and Zephyrhills Airport. At the Tampa Executive Airport, we were charged with establishing a 2nd order class II baseline rotated to "True North".  This baseline was the basis of control for the new Runway 4/22, hangars and office building constructed at the airport.  Subsequently, we have performed topographic surveys for several design teams, tree locations, right-of-way surveys, boundary surveys, set up an aerial control matrix, volumetric, and as-built surveys for construction projects located at the airports in the Tampa Bay area.  We have in-depth hands-on experience with airport projects along with volumes of information regarding the history of development and project survey control points, which would expedite any task assigned to us.

  •  AGIS Surveys
  •  Airfield Rehabilitation Surveys
  •  Topographic Surveys
  •  Prepare Easements
  •  Establish High Order Control Points
  •  Utility Mapping
  •  Wetland Mapping

Featured Project: Tampa International Airport ConRAC